logologologologo
  • Products
  • Solution
    • Intelligent Transportation System
    • Railway
    • IP Surveillance
    • Smart Grid
    • Oil and Gas
    • Renewable Energy
    • Manufacturing Automation
    • Building Automation
    • In-Vehicle
    • ORing Cloud
    • Smart Streetlight
    • IIoT
  • Support
    • ORing RMA Service
    • ODM Service
    • Warranty Policy
    • Technical Service
    • FAQ
    • Product Inquire
  • News
  • Product Inquire
  • Where to buy
    • North America
    • Central America
    • South America
    • Europe
    • Middle East
    • Africa
    • Russia
    • APAC
    • India
  • About us
    • Company Profile
    • Product Coverage
    • Quality Assurance
    • Contact ORing
    • Milestone
    • CSR
    • Sitemap
  • ORing-PaaS-Cloud
  • Original ORing Website
✕
Application of ORing’s Wireless APs in Marshalling Yard
April 26, 2023
Jinghu High Speed Rail
April 26, 2023

HSR Interlock Control System

Project Introduction

Location: China

Project Name: Interlock Control System of China HSR

Products Deployed: RES-3242GC-E

 

Project Requirement

  • Comprehensive redundancy protections – networking, power, and data
  • Network Management Capability
  • Endurance under tough environments

 

Solution

On October 26, 2010, the Shanghai–Hangzhou High-Speed Railway, also known as the HuHang High Speed Rail, had opened. The Shanghai–Hangzhou High-Speed Railway is 202 km long, stopping at Minhang, Songjiang, and Jinshan Districts of Shanghai City, plus the cities of Jiaxing and Hangzhou in Zhejiang Province. This rail line, with 8 train stations 2 turnouts, is coordinated by HuHang Intercity Station of Shanghai Customer Specialist Center.
The system requires the implementation of the CLC (central logic controller) for each regional section to communicate with the main station – for collectively handling communications with the main station, as well as station-to-station(scene) interface. Additionally, the station also has implementation of the ZLC (zone logic controller), which handles emergency control terminal and other equipment. The ZLC exchanges information with the central station via the secret redundancy channel, forming "regional computer network system loaded with ability for live emergency control".

This project uses 20 ORing RES-3242GC-E Ethernet switches. Two of these ORing Ethernet switches are placed at each train station for dual-link network redundancy. Each RES-3242GC-E is connected to 2 servers for RAID 1 redundancy. Different units of RES-3242GC-E are inter-connected in 2x2-and-get-2 hardware redundancy, and the communications among all sub-stations and the main station are carried through the SDH transmission network of Ministry of Railways.

 

System Structure

 

Why Oring

  • Industrial-grade design with a wide temperature range and five-year warranty
  • High installation flexibility and fast speed
Share
notadmin
notadmin

Related posts

April 26, 2023

US Train Company Upgraded On-board Networks with ORing’s 10G Solutions


Read more

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ORing is committed to provide world-class product, strong technical support team for technical consulting and best atter-sale service.
Copyright © 2023 ORing Industrial Networking Corp. All Rights Reserved.